II. Expedition Dates

2000-2001 MODS

2000-2001 PLANS

 
Section II of the Modifications of Activities Planned for 2000-2001 lists the actual dates of significant events occurring during this time period.


  
Significant Dates of Expeditions

Date Activity
28 Mar 00 LMG00-3A Acquisition and operation of broadband seismograph 
   equipment at Chilean bases in the Antarctic Peninsula Region. 
   (Wiens, Visbeck)
7 Apr 00 NBP00-2 Ocean Bottom Seismometer Refraction Profiling for 
   Crustal Structure in the Bransfield Strait (Austin).
25 Apr 00 LMG00-4 Mooring Retrieval. Palmer Station Logistics port 
   call.(Dunbar)
10 May 00  NBP00-3 Study of sediment dispersal patterns across the Palmer 
   Deep region of Antarctica. (Domack)
16 May 00 LMG00-5 Multidisciplinary study in the Deception Island caldera 
   (K. Smith, Scheltema, Chereskin, Sturz)
5 Jun 00 NBP00-4 Study of the impact and fate of bloom material on the 
   West Antarctic Shelf seafloor. (Smith, DeMaster)
19 Jun 00 LMG00-6A through LMG00-6D. Palmer Station Logistics Support.
1 Jul 00 NBP00-5 Palmer Station hazardous waste pickup for transport to and
   disposal in United States
19 Jul 00 NBP00-6A Hazardous waste transport and support of “science of 
   opportunity” Biology & Medicine project. (Jeffrey)
13 Aug 00 NBP re-bid vessel modifications, maintenance period and 
   seismic/SeaBeam sea trials preparation begins at PortFourchon, 
   Louisiana.
15 Aug 00 LMG00-7 Transit to Talcahuano, Chile and subsequent maintenance 
   period.
21 Aug 00 First flight to McMurdo for Winfly operations
3 Sep 00 NBP00-6B Charter re-bid Acoustic and SeaBeam trials. Antarctic 
   Research Vessel Oversight Committee meeting held onboard.
11 Sep 00 Vessel modifications, seismic systems and SeaBeam sea trials’ 
   preparation continue.
15 Sep 00 LMG00-8 Palmer Station Opening/Turnover Shuttle #1.
25 Sep 00 NBP00-6C Seismic System and SeaBeam 2112 Sea Trials.
1 Oct 00 LMG00-8A Palmer Station Opening/Turnover Shuttle #2. Study of 
   natural product drugs from cold-water marine organisms. (Dietzman)
03 Oct 00 First C-141 mission to McMurdo during Ice Runway period (1 of 23); 
   McMurdo Station commenced summer operations
05 Oct 00 First C-17 mission to McMurdo of the season (1 of 5)
05 Oct 00 Marble Point opens
5 Oct 00 NBP00-6D Transit to Punta Arenas, Chile.
11 Oct 00 Lake Hoare field camp opens
12 Oct 00 Lake Fryxell field camp opens
12 Oct 00 Lake Bonney field camp opens
17 Oct 00 LMG00-9 Study of the impact and fate of bloom material on the 
   West Antarctic Shelf seafloor. (C. Smith, DeMaster) Open 
   Copacabana Field Camp. (Trivelpiece)
21 Oct 00 Pieter J. Lenie Field Station ("Copacabana") opens
23 Oct 00 South Pole begins summer operations
27 Oct 00 NBP00-7A UNOLS Ocean Bottom Seismometer Refraction 
   Profiling for Crustal Structure in the Bransfield Strait (Austin)
01 Nov 00 Siple Dome opens
03 Nov 00 Byrd Surface Camp opens
09 Nov 00 Icestream C opens
12 Nov 00 LMG00-10 Ongoing time-series study of the water column and 
   benthic community in and around the Deception Island caldera 
   region of Antarctica. (K. Smith) Open Cape Shirreff Field Camp. 
   NOAA)
13 Nov 00 Darwin Glacier field camp opens
16 Nov 00 Cape Shirreff Field Station opens
19 Nov 00 NBP00-7B Reconstructions of the late Cretaceous and Cenozoic 
   periods in the southwest Pacific Ocean. (Cande)
2 Dec 00 East Camp at Vostock opens
03 Dec 00 109th AW brings sixth LC-130 aircraft to McMurdo
8 Dec 00 LMG00-11 Study of global climate change and the evolutionary 
   ecology of Antarctic Mollusks in the late Holocene. (Aronson)
09 Dec 00
Transfer flight operations from sea ice runway to Williams field 
   skiway. 
20 Dec 00 NBP00-8 Study of shelf and bottom water formation near East 
   Antarctic polynyas and glaciers. (Fairbanks, Jacobs, Arrigo)
30 Dec 00 Darwin Glacier field camp closes
04 Jan 01 LMG01-1 Long-Term Study of the Antarctic Marine Ecosystem: An 
   Ice-Dominated Environment (LTER)(Fraser, Vernet, Martinson 
   Quetin, Smith, Karl)
11 Jan 01 Byrd Surface Camp closes
24 Jan 01 Lake Fryxell field camp closes
25 Jan 01 East Camp at Vostock closes
25 Jan 01 M/V LAWRENCE H. GIANELLA (tanker) moored at McMurdo 
   ice pier and commences station refueling operations
27 Jan 01 Refueling operations completed; GIANELLA departs McMurdo 
27 Jan 01 Siple Dome field camp closes
27-28 Jan 01 USCGC POLAR SEA refuels Marble Point
29 Jan 01 NBP01-1 Study of Quaternary glacial history and paleoenvironments of
    the East Antarctic Margin by GO-074-O. OO-278-O studied
    particulate organic carbon production and export in the Indian Sector
    of the Southern Ocean. (Leventer, Pilskaln)
30 Jan 01 Lake Bonney field camp closes
31 Jan 01 First C-141 mission to McMurdo for redeployment (1 of 11)
02 Feb 01 LMG01-1A United States State Department Antarctic Treaty 
   Inspection. Palmer Station Logistics port call.
05 Feb 01 Icestream C closes
9 Feb 01 GREEN WAVE arrives McMurdo ice pier; cargo offload operations
   commence
10 Feb 01 Marble Point closes
10 Feb 01 Lake Hoare field camp closes
15 Feb 00 GREEN WAVE departs McMurdo ice pier; cargo operations 
   completed. 
16 Feb 01 ARCHANGELGRACHT arrives McMurdo ice pier; cargo offload 
   operations commence
18 Feb 01 ARCHANGELGRACHT departs McMurdo ice pier; cargo 
   operations completed. 
19 Feb 01 POLAR SEA completes McMurdo operations
20 Feb 01 LMG01-2 Study of the impact and fate of bloom material on the 
   West Antarctic Shelf seafloor.(C. Smith, DeMaster)
22 Feb 01 Final C-141 turnaround mission at McMurdo
23 Feb 01 109th AW departs McMurdo
23 Feb 01 McMurdo Station commences winter-over operations 
28 Feb 01 Cape Shirreff Field Station closes
01 Mar 01 Pieter J. Lenie Field Station ("Copacabana") closes
18 Mar 01 LMG01-3 Southern Ocean Global Ecosystem (SO GLOBEC)
   multi-year, multi-vessel project begins on the Laurence M. Gould. 
   (Beardsley) King George Island Camp Opening. (Hall)
21 Apr 01 Two Twin Otter aircraft operated by Ken Borek Air Ltd. departed 
   Punta Arenas, Chile, and arrived at Rothera Station, Antarctica on 
   the first leg of a flight to effect a medical evacuation from South 
   Pole Station
24 Apr 01 One Twin Otter aircraft departed Rothera Station and arrived at 
   South Pole Station
24 Apr 01 A Royal New Zealand Air Force C-130 left Christchurch for 
   McMurdo Station to effect a medical evacuation
25 Apr 01 The Royal New Zealand Air Force C-130 returned to Christchurch 
   from McMurdo Station carrying 11 passengers redeployed for 
   medical/personal reasons
25 Apr 01 The Twin Otter aircraft departed South Pole and arrived at Rothera 
   Station carrying 1 passenger redeployed for medical reasons

LMG = R/V LAURENCE M. GOULD
 
NBP = R/V NATHANIEL B. PALMER

 
PreviousBack to Table of ContentsNextSearchDownloadMore InfoTreaty Homewww.nsf.govOPP Home

     Contact OPP